TBM Kaveri completes 685‑metre underground drive to Kilpauk Medical College
By United One News · AI-generated summary of 1 outlets' reporting
Published
AI-generated summary of the coverage listed below:
Chennai Metro’s TBM Kaveri finished a 685‑metre tunnel from Chetpet to Kilpauk Medical College Station as part of Phase‑II works.
Covered by 1 outlet across the spectrum: 0% left, 0% center, 100% right.
How each side framed it
TBM Kaveri Breaks Through At Kilpauk Medical College
Timeline
First reported by Deccan Chronicle on ; 1 article from 1 outlets so far.
Who is covering this story
- Right-leaning (1): Deccan Chronicle
Sources
- TBM Kaveri Breaks Through At Kilpauk Medical College — Deccan Chronicle (right-leaning) ·