India to require domestically designed chips in smart meters by mid‑2028

By United One News · AI-generated summary of 2 outlets' reporting

Published · Updated

AI-generated summary of the coverage listed below: The Indian government announced that all smart electricity meters will be required to use chips designed in India starting in mid‑2028. The mandate, revealed by Power Secretary Pankaj Agarwal, aims to cut reliance on imported components, enhance cybersecurity in the power distribution network, and stimulate growth in the domestic semiconductor industry, including chip design and fabrication. This policy is part of a broader effort to strengthen India’s technology self‑reliance and secure critical infrastructure.

Covered by 2 outlets across the spectrum: 0% left, 50% center, 50% right.

How each side framed it

Domestic chip mandate for smart meters by mid-2028: Power Secretary Pankaj Agarwal

Center · Indian Express

India Eyes Mid-2028 Mandate For Domestically Designed Chips In Smart Electricity Meters

Right-leaning · Swarajya

Timeline

First reported by Indian Express on ; 2 articles from 2 outlets so far.

Who is covering this story

Sources

What an outlet bias classification means

Related stories